- Door-to-door transit
- 15–17 days
- Line length
- 9,610 km
- Departures
- 4 /week
DSK · MWLDSK · MWL
Check a live train on this routeNorthern corridor · live network status
EuroCargo puts a sensor on every China–Europe block train: bogie exchange at Dostyk and Małaszewicze, customs procedures, reefer telemetry and an ETA that recalculates when the network actually moves — not when the carrier last emailed you.
Public tracking · no sign-up needed · API for your own systems
Hover a terminal for capacity, gauge and dwell data
0
Shipments in transit
0 TEU
TEU handled per month
0
Countries on the corridor
0.0 %
On-time arrival, rolling 90 days
Counters are recomputed from the corridor feed every five minutes. Figures cover the northern route through Małaszewicze; the southern alternatives are quoted on request.
How it works
Nothing exotic: a fixed data model, terminals that report on time, and a platform that refuses to invent a status it has no event for.
You send the SMGS consignment note and cargo parameters. We reserve a place in a scheduled block train and return a EC-XXXXXX identifier within one business day.
Container stuffing, seal numbers and the export declaration are attached to the shipment record before the train leaves the origin terminal.
Position pings every 2–4 hours. The two bogie exchanges — Dostyk/Alashankou and Brest/Małaszewicze — are tracked as first-class events, with dwell time measured, not estimated.
T1 transit, IM1 release, unloading and last-mile delivery close the record. The signed POD is written back to your ERP through the same API that created the booking.
Scheduled block trains
Transit time is the sum of the legs we schedule, including dwell at the gauge-exchange terminals. Schedules below are the November 2026 plan.
DSK · MWLDSK · MWL
Check a live train on this routeDSK · MWLDSK · MWL
Check a live train on this routeDSK · MWLDSK · MWL
Check a live train on this routeDSK · MWLDSK · MWL
Check a live train on this routeDSK · MWLDSK · MWL
Check a live train on this routeDSK · MWLDSK · MWL
Check a live train on this routePlatform
Five things a spreadsheet cannot do on a 15-day train.
Train position along the route, the next scheduled hub and the reason the ETA changed — each ETA move carries the event that caused it.
Export, T1 transit and IM1 release are separate states with office codes and MRN, so your broker and your warehouse read the same record.
1435 ↔ 1520 mm transshipment is where China–Europe schedules are won and lost. We model it as a scheduled dwell with measured queue time.
Setpoint, band and last ping for every 40RH. A drift outside the band raises an alert while there is still time to re-plug the unit.
REST on the same records the cabinet uses, plus signed webhooks on status change. Idempotent, paginated, versioned in the URL.
Four read endpoints, one record shape, bearer-token authentication. Every example on this page runs against the live service on this host — change the identifier and the response changes with it.
Integrations
Most clients never open the cabinet. They read it from their own stack.
HTTPСоединение + JSON. A single common module returns track status into the sales order and writes the POD back. Works on 1C 8.3.15 and newer.
Common module
OData adapter and IDoc mapping for transportation units. Statuses map to your own event codes instead of ours.
OData / IDoc
One upload with EC identifiers refreshes the whole column. No API key, no ticket, no waiting for IT.
Bulk
Signed POST on every status transition, with retry and replay window. Consumed by TMS, WMS or a Slack channel, your call.
Push
Test keys and a sample data set with ten shipments ship with every plan.
Clients
“Before EuroCargo our planner asked the carrier where the train was and got an answer two days late. Now she opens one screen and answers the client in the same call. That removed about 80% of the reactive e-mail from our week.”
Marta Kowalczyk
Head of Rail Operations · Vistula Freight Systems, Gdańsk
“The gauge-exchange dwell number is the part we did not know we needed. Seeing 11 hours planned against 19 actual at Małaszewicze is what finally let us commit a realistic delivery date to retail clients.”
Dimitri Vogel
Supply Chain Lead · Rheinwerk Industrietechnik, Duisburg
“We pull the API into 1C every forty minutes. Customs release status lands on the order automatically, and the accountant stopped chasing paper. Integration took an afternoon, not a project.”
Aizhan Serikova
IT Logistics Manager · Alatau Trade Logistics, Almaty
Send us one SMGS reference and we will return a live record for your next China–Europe train, on the same feed that powers the API.
Answer within one business day · CET 08:00–18:00